{"id":2499,"date":"2025-06-19T19:36:21","date_gmt":"2025-06-19T11:36:21","guid":{"rendered":"https:\/\/www.ledphotometer.com\/blog\/lamp-start-run-up-time-and-flicker-test-system\/"},"modified":"2025-07-01T16:58:15","modified_gmt":"2025-07-01T08:58:15","slug":"lamp-start-run-up-time-and-flicker-test-system","status":"publish","type":"post","link":"https:\/\/www.ledtestinstrument.com\/es\/productos\/lamp-start-run-up-time-and-flicker-test-system\/","title":{"rendered":"LSRF-3 Lamp Flicker Test work with integrating sphere"},"content":{"rendered":"<p style=\"text-align: left;\">LSRF-3 Lamp start, Run-up time and Light Flickering Analyzer \u2013 Flicker Tester is equipped with Class A photo detector, so the sampling speed is up to 100kHz. It fully meets the requirement of BASIC, <a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/ENERGY-STAR-Lamps-V2.1-Draft-1-FINAL-Standard-Free-Download.pdf\" target=\"_blank\" rel=\"noopener\">Energy Star V2.1<\/a>, <a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/IEC-TR-61547-1-2020-Standard-Free-Download.pdf\" target=\"_blank\" rel=\"noopener\">IEC TR 61547-1:2020 IEC-Pst<\/a>, CA CEC, ASSIST, <a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/CIE-TN-006-2016-Standard-Free-Dowload.pdf\" target=\"_blank\" rel=\"noopener\">CIE TN006-2016 CIE SVM<\/a>, IEEE Std 1789 standards, etc. It is professional for flicker test of LED lights and lamps, energy-saving lamps, etc. According to EU directives 1194\/2012, 2009\/125 \/ EC, <strong><a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/10\/SASO-2902-2018-ENERGY-EFFICIENCY-FUNCTIONALITY-AND-LABELING-REQUIREMENTS-FOR-LIGHTING-PRODUCTS-PART-2.pdf\" target=\"_blank\" rel=\"noopener\">SASO2902<\/a>, <\/strong><a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2021\/06\/EU2019-2015.pdf\" target=\"_blank\" rel=\"noopener\">REGLAMENTO DELEGADO (UE) 2019\/2015 DE LA COMISI\u00d3N<\/a>, <a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2021\/06\/EU2019-2020.pdf\" target=\"_blank\" rel=\"noopener\">COMMISSION REGULATION (EU) 2019\/2020<\/a> and IEC60969 \u201cSelf-ballasted Lamps for General Lighting Services\u2014Performance Requirements\u201d and other requirements. The LSRF-3 can connects with PC via USB cable. The English version software can be run in Win7, Win8, Win10, Win11 (Microsoft certified driver)<\/p>\n<p><strong>Est\u00e1ndar:<\/strong><br \/>\n<a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/ENERGY-STAR-Lamps-V2.1-Draft-1-FINAL-Standard-Free-Download.pdf\" target=\"_blank\" rel=\"noopener\">Energy Star V2.1<\/a> \u201d Lamps Program Requirements V2.1\u2033<br \/>\n<a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/IEC-TR-61547-1-2020-Standard-Free-Download.pdf\" target=\"_blank\" rel=\"noopener\">IEC TR 61547-1:2020<\/a> \u201cEquipment for general lighting purposes \u2013 EMC immunity requirements \u2013 Part 1: Objective light flickermeter and voltage fluctuation immunity test method \u201c<br \/>\n<a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/CIE-TN-006-2016-Standard-Free-Dowload.pdf\" target=\"_blank\" rel=\"noopener\">CIE TN006-2016 CIE SVM<\/a> \u201cVisual Aspects of Time-Modulated Lighting Systems \u2013 Definitions and Measurement Models\u201d<br \/>\nIEEE Std 1789 \u201cIEEE Recommended Practices for Modulating Current in High-Brightness LEDs for Mitigating Health Risks to Viewers\u201d<br \/>\nIEC60969 \u201cSelf-ballasted Lamps for General Lighting Services\u2014Performance Requirements\u201d<\/p>\n<p style=\"text-align: left;\"><strong>1. Lamp Flicker test interface needs to work with LISUN <a href=\"https:\/\/www.lisungroup.com\/products\/integrating-sphere\/\" target=\"_blank\" rel=\"noopener\">Esfera Integradora<\/a>, <a href=\"https:\/\/www.lisungroup.com\/products\/ac-and-dc-power-supply\/digital-cc-and-cv-dc-power-supply.html\" target=\"_blank\" rel=\"noopener\">Fuente de alimentaci\u00f3n CC<\/a> y <a href=\"https:\/\/www.lisungroup.com\/products\/photometer-and-colorimeter\/standard-light-source.html\" target=\"_blank\" rel=\"noopener\">Fuente de luz est\u00e1ndar<\/a>. It also can be added in LISUN <a href=\"https:\/\/www.lisungroup.com\/products\/led-test-instruments\/high-precision-spectroradiometer-integrating-sphere-system.html\" target=\"_blank\" rel=\"noopener\">LPCE-2<\/a> \/<a href=\"https:\/\/www.lisungroup.com\/products\/led-test-instruments\/ccd-spectroradiometer-integrating-sphere-compact-system.html\" target=\"_blank\" rel=\"noopener\">LPCE-3<\/a> Integrating Sphere System or <a href=\"https:\/\/www.lisungroup.com\/products\/goniophotometer\/lm-79-moving-detector-goniophotometer.html\" target=\"_blank\" rel=\"noopener\">LSG-6000<\/a>\/<a href=\"https:\/\/www.lisungroup.com\/products\/goniophotometer\/high-precision-rotation-luminaire-goniophotometer.html\" target=\"_blank\" rel=\"noopener\">LSG-1890B\/LSG-1800A<\/a> Goniophotometer system or <a href=\"https:\/\/www.lisungroup.com\/products\/goniophotometer\/lm-79-moving-detector-goniophotometer.html\" target=\"_blank\" rel=\"noopener\">LSG-6000CCD<\/a>\/<a href=\"https:\/\/www.lisungroup.com\/products\/goniophotometer\/high-precision-rotation-luminaire-goniospectroradiometer.html\" target=\"_blank\" rel=\"noopener\">LSG-1890BCCD\/LSG-1800ACCD<\/a> Goniospectroradiometer system, please click <a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/flicker-test-report.pdf\" target=\"_blank\" rel=\"noopener\">here to see the Lamp Flicker Test Report Sample<\/a>:<\/strong><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-4582 size-full\" src=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-1.jpg\" sizes=\"(max-width: 1000px) 100vw, 1000px\" srcset=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-1.jpg 1000w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-1-400x212.jpg 400w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-1-768x408.jpg 768w\" alt=\"LSRF 3 Lamp Start, Run Up Time And Flicker Test System 1\" width=\"1000\" height=\"531\" title=\"\"><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-4583 size-full\" src=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-4.jpg\" sizes=\"(max-width: 1000px) 100vw, 1000px\" srcset=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-4.jpg 1000w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-4-400x212.jpg 400w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-4-768x408.jpg 768w\" alt=\"LSRF 3 Lamp Start, Run Up Time And Flicker Test System 4\" width=\"1000\" height=\"531\" title=\"\"><\/p>\n<p><strong>2. Lamp Start and Run-up Test: Please click <a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/start-run-up-test-report.pdf\" target=\"_blank\" rel=\"noopener\">here to see the Lamp Start and Run-up Test Report Sample<\/a>. The LSRF-3 needs to work with LISUN\u2019s <a href=\"https:\/\/www.lisungroup.com\/products\/ac-and-dc-power-supply\/ac-power-source.html\" target=\"_blank\" rel=\"noopener\">LSP-500VARC AC Power Source (With Trigger Function) or LSP-500VARC-Pst (IEC-Pst AC Power Source)<\/a> to test the Start and Run-up time of lamps which is according to <span style=\"color: #333333;\"><span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/energy-star-start-time-test-method.pdf\" target=\"_blank\" rel=\"noopener\">clause 11.4 Start Time Test Method<\/a><\/span> &amp;<\/span> <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/energy-star-run-up-time-test-method.pdf.pdf\" target=\"_blank\" rel=\"noopener\">clause 11.5 Run-Up Time Test Method<\/a><\/span> in the US Standards of <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/ENERGY-STAR-Lamps-V2.1-Draft-1-FINAL-Standard-Free-Download.pdf\" target=\"_blank\" rel=\"noopener\">Energy Star V2.1<\/a><\/span>,<\/strong><strong>\u00a0y <span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/10\/SASO-2902-2018-ENERGY-EFFICIENCY-FUNCTIONALITY-AND-LABELING-REQUIREMENTS-FOR-LIGHTING-PRODUCTS-PART-2.pdf\" target=\"_blank\" rel=\"noopener\">SASO2902<\/a><\/span> Table 13:<\/strong><\/p>\n<p><img decoding=\"async\" class=\"alignnone wp-image-4581 size-full\" src=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-5.jpg\" sizes=\"(max-width: 1000px) 100vw, 1000px\" srcset=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-5.jpg 1000w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-5-400x212.jpg 400w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/LSRF-3-Lamp-Start-Run-up-Time-and-Flicker-Test-System-5-768x408.jpg 768w\" alt=\"LSRF 3 Lamp Start, Run Up Time And Flicker Test System 5\" width=\"1000\" height=\"531\" title=\"\"><\/p>\n<p><strong>3. According to <a href=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/IEC-TR-61547-1-2020-Standard-Free-Download.pdf\" target=\"_blank\" rel=\"noopener\">IEC TR 61547-1:2020<\/a>, the LSRF-3 can do the Light Pst V measurement on AC Stable as below Figure 1a , and also can do the Light Pst LM(I) measurement on AC Fluctuation as below Figure 1b. Note:\u00a0 The Light Pst LM(I) measurements need to work with LISUN\u2019s <a href=\"https:\/\/www.lisungroup.com\/products\/ac-and-dc-power-supply\/ac-power-source.html\" target=\"_blank\" rel=\"noopener\">LSP-500VARC-Pst (IEC-Pst AC Power Source)<\/a><br \/>\n<\/strong><\/p>\n<div id=\"attachment_5950\" class=\"wp-caption aligncenter\" style=\"width: 1010px;\">\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5950 size-full\" src=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/light-pst-lm-i-flicker-test-principle.jpg\" sizes=\"(max-width: 1000px) 100vw, 1000px\" srcset=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/light-pst-lm-i-flicker-test-principle.jpg 1000w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/light-pst-lm-i-flicker-test-principle-400x300.jpg 400w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/light-pst-lm-i-flicker-test-principle-768x577.jpg 768w\" alt=\"\" width=\"1000\" height=\"751\" aria-describedby=\"caption-attachment-5950\" title=\"\"><\/p>\n<p id=\"caption-attachment-5950\" class=\"wp-caption-text\"><span style=\"color: #ff0000;\">Light Pst LM and Pst LM (I) Flicker Test Principle in IEC TR 61547-1:2020<\/span><\/p>\n<\/div>\n<div id=\"attachment_5951\" class=\"wp-caption aligncenter\" style=\"width: 1010px;\">\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5951 size-full\" src=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/programmable-ac-power-signal-generator.jpg\" sizes=\"(max-width: 1000px) 100vw, 1000px\" srcset=\"https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/programmable-ac-power-signal-generator.jpg 1000w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/programmable-ac-power-signal-generator-400x378.jpg 400w, https:\/\/www.lisungroup.com\/wp-content\/uploads\/2019\/12\/programmable-ac-power-signal-generator-768x726.jpg 768w\" alt=\"\" width=\"1000\" height=\"945\" aria-describedby=\"caption-attachment-5951\" title=\"\"><\/p>\n<p id=\"caption-attachment-5951\" class=\"wp-caption-text\"><span style=\"color: #ff0000;\">Programmable AC Power Signal Output when do Flicker Immunity Pst LM(I) test in IEC TR 61547-1:2020<\/span><\/p>\n<\/div>\n<p><strong><span style=\"color: #0000ff;\"><a style=\"color: #0000ff;\" href=\"https:\/\/www.lisungroup.com\/news\/technology-news\/lisun-lsrf-3-lamp-start-run-up-time-and-flicker-test-system-after-sales-questions-and-answers.html\" target=\"_blank\" rel=\"noopener\">LISUN LSRF-3 Lamp Start, Run-up Time and Flicker Test System \u2013 After-sales Frequently Asked Questions (FAQ)<\/a><\/span><br \/>\n<\/strong>LISUN LSRF-3 Lamp Start, Run-up Time and Flicker Test System were in the market for more than 10 years, LISUN engineers service team already summary the most of the After Sales Questions and Answers in the above link. Please read it carefuly, you can solve the most of the problems by yourself if you have some questions while using the instruments. LISUN will be continue to update this pages and more FAQ can be found in this topic link.<\/p>","protected":false},"excerpt":{"rendered":"<p>LSRF-3 Lamp start, Run-up time and Light Flickering Analyzer \u2013 Flicker Tester is equipped with Class A photo detector, so the sampling speed is up to 100kHz. It fully meets the requirement of BASIC, Energy Star V2.1, IEC TR 61547-1:2020 IEC-Pst, CA CEC, ASSIST, CIE TN006-2016 CIE SVM, IEEE Std 1789 standards, etc. It is [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3529,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[252],"class_list":["post-2499","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-products","tag-lsrf-3"],"_links":{"self":[{"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/posts\/2499","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/comments?post=2499"}],"version-history":[{"count":0,"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/posts\/2499\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/media\/3529"}],"wp:attachment":[{"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/media?parent=2499"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/categories?post=2499"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ledtestinstrument.com\/es\/wp-json\/wp\/v2\/tags?post=2499"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}